• All Projects
  • Fabrication Works
  • Civil Construction
  • Building Construction
  • Procurement & Supply
  • Electrical, Instrumentation & Control
  • Logistics
vst-1

Fabrication and Erection of 500,000litres AGO Storage Tank for International Hydraulic Research Centre, Ugwueke Abia State.

vst-2

Construction of 1,800,000 litres Vertical Cylindrical Fire Water Storage Tank for TOTAL Nig. Plc at TOTAL Gas Plant, Obete, Rivers State.

Completed 8,000 Liters Fuel Storage Tank on Saddle

ug-tank-2

Completed 8,000 Liters Fuel Storage Tank on Saddle

ug-tank-3

Completed 45,000 Liters Fuel Storage Double Wall Tank

dredge-1

Construction of 4-cell box culvert with Retaining Wall and Reclamation along Amana-Zangon Aya-Kofar Gayan Zaria

dredge-1

Construction of 4-cell box culvert with Retaining Wall and Reclamation along Amana-Zangon Aya-Kofar Gayan Zaria

dredge-1

Construction of 4-cell box culvert with Retaining Wall and Reclamation along Amana-Zangon Aya-Kofar Gayan Zaria

dredge-1

Construction of 4-cell box culvert with Retaining Wall and Reclamation along Amana-Zangon Aya-Kofar Gayan Zaria

dredge-1

Construction of 4-cell box culvert with Retaining Wall and Reclamation along Amana-Zangon Aya-Kofar Gayan Zaria

dredge-1

Dredging work

dredge-2

Dredging work

dredge-3

Dredging work

dredge-4

Dredging work

dredge-5

Dredging work

dredge-6

Dredging work

road-constr-1

Road-construction work

road-constr-2

Road-construction work

filling-station-1

Upgrade of filling station canopy, supply and installation of 60m collapsible gate and Lube bay roller shutter door

filling-station-2

Upgrade of filling station canopy, supply and installation of 60m collapsible gate and Lube bay roller shutter door

filling-station-3

Fabrication and erection of steel canopy for service station at Iju-Ishaga SS (Formerlly Fowobi servive station)

filling-station-4

Construction of new steel canopy, Upgrade of existing filling station canopy for about twenty (20) service station within the country

filling-station-5

General rehabilitation, construction of new collapsible gate,painting and repair of steel canopy for service station at Stillwaters Lekki

filling-station-6

Fabrication and erection of steel canopy for service station at Ikotun Igando SS (at Bakare Bus-stop)

filling-station-7

Upgrade of filling station canopy, supply and installation of 60m collapsible gate and Lube bay roller shutter door

filling-station-8

General rehabilitation, construction of new collapsible gate,painting and repair of steel canopy for service station at Stillwaters Lekki

filling-station-9

Fabrication and erection of steel canopy for service station at Poka, Epe SS

filling-station-10

construction of a filling-station

filling-station-11

construction of a filling-station

filling-station-12

construction of a filling-station

truss-1

Fabrication and Erection of 16.5m x 25m Span Portal frame for National Research Institute for Chemical Technology Zaria

truss-2

Construction of 12m Span portal frame for Hydraulic Institute Centre, Abia State.

truss-3

Construction of roof trusses for 10Nos International market buildings at Abakaliki, Ebonyi state.

tank-1

Fabrication and Erection of 1million litres Water Storage Tank on Ground and 500,000litres on 9m Tower at Gwandu

tank-2

Fabrication and Erection of 50,000 litres water storage Tank on 12m tower at Katsina state

buiding-1

Construction of international market at dei dei Abuja

buiding-1

Construction of international market at dei dei Abuja

buiding-1

Construction of international market at dei dei Abuja

buiding-1

Construction of international market at dei dei Abuja

buiding-1

Construction of estate building

buiding-2

Construction of estate building

buiding-3

Construction of estate building

buiding-4

Construction of estate building

buiding-5

Construction of estate building

buiding-6

Construction of estate building

buiding-7

Block of 4 Bedrooms Duplex Built At Osogbo, Osun state

buiding-8

Block of 4 Bedrooms Duplex Located At Lekki Phase 1, Lagos

buiding-9

A Block of 4 Bedroom Bungalow Developed Airport Road, Ilorin

buiding-10

A Block of 4 Bedroom Bungalow Developed Airport Road, Ilorin

buiding-11

Sub-contract to construct 25Units 2 bedroom bungalow for Civil Servant Cooperative Union Niger State

fence-1

Construction of Perimeter Fencing on at a 4.59 Acres Property at Rivers State

Clients